PARADIGM FOR TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE OPERATION
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 50 pages | 1-5 chapters | Amount: ₦5,000 | 1 order. | Marked useful: 5,542 times
Delivery: Within 24 hoursCHAPTER ONE:
1.0 INTRODUCTION
1.1 Background of the study
1.2 Statement of the problem
1.3 Statement of the objectives
1.4 Research questions
1.5 Research hypotheses
1.6 Significance of the study
1.7 Scope of the study
1.8 Limitations of the study
1.9 Definition of terms
CHAPTER TWO:
2.0 REVIEW OF RELATED LITERATURE
2.1 Concept of internal control
2.2 Factors that characterize effective internal control
2.3 Classes of internal control
2.4 Limitations of internal control
2.5 Evaluations of internal control
2.6 Internal control and the auditor
2.7 Public accountability
2.8 Historical overview of the case study
2.9 Internal control and accountability
CHAPTER THREE:
3.0 RESEARCH METHODOLOGY
3.1 Research design
3.2 Sources of data
3.3 Area of study
3.4 Population of the study
3.5 Determination of sample size
3.6 Reliability of the instrument
3.7 Validity of the instrument
3.8 Method of data analysis
CHAPTER FOUR:
4.0 PRESENTATION OF DATA
4.1 Presentation of data
4.2 Test of hypotheses
CHAPTER FIVE:
5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS
5.1 Summary of findings
5.2 Conclusions
5.3 Recommendations
Tags: Total quality management Impact of total quality management Evaluation of total quality management Building maintenance operation Assessment of building maintenance operation Optimization of building maintenance operation
This material content is developed to serve as a GUIDE for students to conduct academic research
Delivery: Within 24 hours
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN EXAMINATION OF HEAVY DOWNPOUR AS A CAUSE OF BUILDING COLLAPSE IN LAGOS STATE (MUSHIN INCIDENCE, 2...
CHAPTER ONE INTRODUCTION Background of the Study Over the past few years, Nigeria has experienced a significant increase in construction failures, lea...More »
Item Type: Project Material | 54 pages | 1,295 engagements |
- 2.
FACTORS AFFECTING THE COMPETENCE AND PROJECT DELIVERY OF SMALL INDEGENIOUS CONSTRUCTION FIRMS
CHAPTER ONE INTRODUCTION 1.1 Background Of Study Building construction is the process of assembling materials to form a building; it is generally p...More »
Item Type: Project Material | 54 pages | 2,223 engagements |
- 3.
AN INVESTIGATION INTO THE CAUSES AND ENVIRONMENTAL EFFECT OF FIRE OUTBREAK IN NIGERIA
. CHAPTER ONE INTRODUCTION Background of the study From the earliest period, the fire that allowed man to prepare food, fight off predators, forge ...More »
Item Type: Project Material | 54 pages | 3,015 engagements |
- 4.
ANALYSIS ON THE SAFETY AND MANAGEMENT METHOD OF FIRE FIGHTERS IN MANAGING FIRE OUTBREAK IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the study There is a significant danger posed to people, animals, and even property by fires that originate ...More »
Item Type: Project Material | 57 pages | 2,649 engagements |
- 5.
A CRITICAL INVESTIGATION ON SAFETY PRACTICE AMONG CONSTRUCTION BASED COMPANIES IN KANO STATE
ABSTRACT This study was carried out to investigate on safety practice among construction based companies using Dantata & Sawoe Construction Compan...More »
Item Type: Project Material | 63 pages | 2,822 engagements |
- 6.
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY-CONTRACTORS’...
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY CONTRACTORS’ PERSPECTIVE IN AKWA IBOM STATE CHAPTER ONE INT...More »
Item Type: Project Material | 60 pages | 3,826 engagements |