In structural detailing, the project is initiated by the structural engineer. The architectural drawings are prepared by the architect to the required scale and specification given to him by the client.
The structural engineer designs the structural frame work of the building and specification required such as slab, beam, column and foundation.
For proper clearification and understanding, the structure is broken down into its component parts and detailed keeping in mind the design consideration.
Structural detailing is the transformation of the works of the structural Engineer into working drawing for the builders to use without any cumbersome.
The methods, symbols and notations used are standardized for uniformity despite the multi-diversity natures of the construction industry. The standard method of measurement and notations ofdetailing a building should be understood before carying the exercise.
The purpose of their written account is to present a straight forward introduction to the basic standard method in detailing reinforced concrete structure and their component parts. Here a structural detailing of three bedroom duplex has been chosen as the project.
Both the architectural work and the civil engineering work have been completed. The subject matter has been arranged so that chapter 1-4 covers the description of basic material and engineering design specification while the last chapter covers the actual detailing of the components, all details are shown in plan elevation and section.
LIST OF ABBREVIATION
For detailing of reinforced concrete, the abbreviation recommended for this project are enlisted as follows:
TYPES OF REINFORCEMENT
Y – high yield
R = round mild steel bars
COMMENTS RELATING TO REINFORCEMENTS
T - top placed
B - bottom placed
@ - centres
c/c – centre to centre
GENERAL ABBREVIATION
Rc – reinforced concrete
Drw – drawings
Fdn – foundation
Conc – concrete
Dia – diameter
Bs – British standard
Cp – code of practice
Nos – numbers
Hf – thickness of flange
Fy – characteristic strenght of reinforcement
Fyy – characteristic strenght of link reinforcement
TABLE OF CONTENTS
Chapter one
Introduction
Chapter two
Reinforced concrete
Chapter three
General principles of detailing of reinforcement concrete
Chapter four
Design information and structural summary
Chapter five
The engineer’s design specification
Chapter six
Detailing of the elements
Bibliography
CHAPTER ONE
INTRODUCTION
The work in the construction industry involves the client, the Architect, the Engineer, the quantity surveyor and the builders. A structural project is initiated by the Engineer (civil Engineer).
The process of designing begins with the enginer’s appreciation of the client’s requirements. After the specification given to the engineer by architect according to the requirement of the client, the engineer develops different structural schem from the architectural plan and calculated the ultimate bending moment and designed load, which will help him to know te axid C load and neutral axis where the structure is liable to settle and develops sagging or hpgging due to improper use of reinforcement bar. Having considered the use of material and erection methods and then comes up with the final work of full structural analysis and detailed design.
Structural detailing can be defined as the process by which the design of a structural system is drafted in a form that a builder can use for construction for easy establishment.
Also structural drawings are the principle means by which the designer communicates his requirements in a clean and unambiguois manner to the builder.
This project outlines the important components and basic techniques and methods required for structural detailing of a reinforced concrete duplex.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN EXAMINATION OF HEAVY DOWNPOUR AS A CAUSE OF BUILDING COLLAPSE IN LAGOS STATE (MUSHIN INCIDENCE, 2...
CHAPTER ONE INTRODUCTION Background of the Study Over the past few years, Nigeria has experienced a significant increase in construction failures, lea...More »
Item Type: Project Material | 54 pages | 1,074 engagements |
- 2.
FACTORS AFFECTING THE COMPETENCE AND PROJECT DELIVERY OF SMALL INDEGENIOUS CONSTRUCTION FIRMS
CHAPTER ONE INTRODUCTION 1.1 Background Of Study Building construction is the process of assembling materials to form a building; it is generally p...More »
Item Type: Project Material | 54 pages | 2,047 engagements |
- 3.
AN INVESTIGATION INTO THE CAUSES AND ENVIRONMENTAL EFFECT OF FIRE OUTBREAK IN NIGERIA
. CHAPTER ONE INTRODUCTION Background of the study From the earliest period, the fire that allowed man to prepare food, fight off predators, forge ...More »
Item Type: Project Material | 54 pages | 2,825 engagements |
- 4.
ANALYSIS ON THE SAFETY AND MANAGEMENT METHOD OF FIRE FIGHTERS IN MANAGING FIRE OUTBREAK IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the study There is a significant danger posed to people, animals, and even property by fires that originate ...More »
Item Type: Project Material | 57 pages | 2,503 engagements |
- 5.
A CRITICAL INVESTIGATION ON SAFETY PRACTICE AMONG CONSTRUCTION BASED COMPANIES IN KANO STATE
ABSTRACT This study was carried out to investigate on safety practice among construction based companies using Dantata & Sawoe Construction Compan...More »
Item Type: Project Material | 63 pages | 2,608 engagements |
- 6.
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY-CONTRACTORS’...
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY CONTRACTORS’ PERSPECTIVE IN AKWA IBOM STATE CHAPTER ONE INT...More »
Item Type: Project Material | 60 pages | 3,516 engagements |