DESIGN AND IMPLEMENTATION OF AUTOMATIC THREE PHASE SELECTOR SWITCH
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | Marked useful: 5,889 times
Delivery: Within 24 hoursABSTRACT
Automatic 3 phase selector switch is a replacement of 3 phase manual change over cut fuse from one cut out to another. Automation 3 phase selector switch has an input of 3 phases from PHCN but has one output that supply current to the load. The device monitors the voltage supply of each phase (Red, yellow and blue) when theirs power failure in a particular phase it will automatically change over to another where their is voltage supply and also monitors the amount of voltage in each phase and select the voltage that is more higher than others and give it out as a single phase power supply. Automatic 3 phase selector switch help to minimize the stress of operating a change over switch from one phase to another manually, and also the risk of been electrocuted.
CHAPTER ONE
INTRODUCTION
1.0 BACKGROUND OF THE SEMINAR
Initially, 3-phase voltage selector system invented manually with operating process of time wasted and inconvenience. The interest of automatic 3-phase voltage selector system is on the fact that technology advancement has made it possible to minimize cost, hard labor and time wasted, and also improves the reliability of our electrical and electronics system. Therefore with the help of electromechanical switching system through the principle of solenoid, a system has been designed such that electromechanical device like a relay and contactor is arranged to automatically change from one phase to other without human intervention. This design is of high efficiency and very accurate in its performance, this is because switching is done by automation without time delay. The 3-phase automatic voltage selector system uses reliable electrical/electronics components such as relay transformers, contactor, diode capacitor, resistor and other switching component.
The operation of this device is that when there is a failure in any of the each line thereby leading to a no output voltage, it select automatically to other phase without time delay. This project is applicable in homes, factories, corporate offices and commercial business center. This system also transfers maximum power to the load.
1.1 AIMS AND OBJECTIVES OF THE SEMINAR
The objective and aim of this research is as follows:
I. To select automatically a voltage that is present in power line.
II. To avoid stress and inconvenience in selecting of phase voltage.
III. To build a system that can be able to choose any voltage that appear to be of high potential among other voltage.
1.3 LIMITATION OF THE SEMINAR
The hindrance encountered on this research work are:
· Financial Crises
· High cost of material/component.
· Research group misunderstanding
· Physical stress
· Miscalculation
The hindrances encountered on this research work is
Financial crises
High cost of material/component
Research groups misunderstanding
Physics stress
Miscalculation
Financial Crises: Financial crises will also contribute to the problem encountered on this research work, financially, the money won’t be available to buy all the component and material needed to construct this project due to human want.
High cost of material/component: Based on high cost of materials/component.
It can also be a reason for a student not to embark on this project rather, it will also look for the one it material is low.
Research group misunderstanding: In any group of people or organization there must be a dispute between them. This can be another issue that can cause a hindrance to this research work.
Physical stress: Not everyone has the opportunity or the physical stress to embarked on this project based on time, opportunity and physical fitness.
Miscalculation: Mathematically, miscalculation can cause a problem in a group base on financial issue.
This material content is developed to serve as a GUIDE for students to conduct academic research
Delivery: Within 24 hours
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN INVESTIGATION INTO THE CONSEQUENCES OF OVER LOADING A TRANSFORMER
AN INVESTIGATION INTO THE CONSEQUENCES OF OVER LOADING A TRANSFORMER CHAPTER ONE INTRODUCTION Background of the study Transformers play a crucial r...More »
Item Type: Project Material | 54 pages | 951 engagements |
- 2.
THE ROLE OF ELECTRICITY TARIFF HIKES IN PROMOTING RENEWABLE ENERGY ADOPTION IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the Study Renewable energy is energy derived from natural sources that are replenished at a higher rate than...More »
Item Type: Project Material | 54 pages | 894 engagements |
- 3.
AN ASSESMENT OF THE NATIONAL GRID FAILURES AND THE WAY FORWARD
CHAPTER ONE INTRODUCTION 1.1 Background of the study Electricity has become an essential element of contemporary life worldwide, serving various purpo...More »
Item Type: Project Material | 54 pages | 1,055 engagements |
- 4.
IMPACT OF FORMAL EDUCATION ON COMMUNITY DEVELOPMENT IN OREDO LOCAL GOVERNMENT, EDO STATE
ABSTRACT The broad objective of this study is to examine the impact of formal education on community development in Oredo Local Government, Edo State....More »
Item Type: Project Material | 54 pages | 6,520 engagements |
- 5.
CONSTRUCTION OF CRITICAL TEMPERATURE ALARM SYSTEM
ABSTRACT The term “critical point” is sometimes used to denote specifically the vapour liquid critical point of a material. The vapour liquid ...More »
Item Type: Project Material | 46 pages | 12,693 engagements |
- 6.
THE CONSTRUCTION OF LABORATORY EQUIPMENT FOR THE DETERMINATION / INVESTIGATION OF ELECTRICAL INSULAT...
ABSTRACT Insulation deterioration occurs on power system when insulators are subjected to abnormal stresses. Since insulators cannot resist indefinite...More »
Item Type: Project Material | 31 pages | 8,637 engagements |